Download
Stage design · 2026  ·  Nyayo National Stadium  ·  8 Nov 2026

Upper Room Kenya

The full production visualised in 3D before a single truss goes up: stage, roof, seven LED surfaces, PA and a programmed light show, set to scale inside the stadium.

At a glance

Built to the production spec

80 × 60 ft
Three-layer stage · 4 / 4.5 / 5 ft
14 m
Roof trim · 26.4 × 12.2 m grid on 4 towers
7
LED surfaces · 30 × 5 m centre screen
3 + 3
Line arrays per side · plus 4 rear fills
75 m
Stage lip to FOH mix position
37,000+
Audience in the stands, modelled seat by seat
Views

Day and night, from every seat that matters

Placement

On the east straight, facing the VIP grandstand

The stage backs onto the East stand with a 2.7 m service lane and faces west across the pitch. East rows A–F behind the rig are held for production; the rear screens and fills serve the rest of that stand.

Three full-width deck layers step up 6 inches each, with lit nosings, four access stairs and guardrails on the upstage drop. A barricade 3.8 m out gives a 2.6 m clear pit.

  • Centre screen30 × 5 m · motion graphics
  • Main screens L + R12.5 × 7 m · IMAG
  • Pyramid screens L + R9 × 6.5 m · turned 68° out
  • Rear screens3 × 8 × 4.5 m · East stand
  • LED ticker / header27 × 0.75 m · 6.5 × 1.5 m
  • Light pods1 · 2 · 3 diamonds + 2 side pods
  • Arrays 1 / 2 / 30° · 15° · 72° from straight ahead
  • Subwoofers24 · cardioid along the lip